Shri Rama Vidya Kendra, managed by Vivekananda Vidyavardhaka Sangha, Puttur, is a 15-acre rural educational institution located in Kalladka, Bantwala Taluk, Karnataka. The campus serves over 4000 students from rural and semi-urban backgrounds. In its commitment to sustainability and holistic education, the institution plans to set up a Sewage Treatment Plant (STP) to recycle wastewater and promote an eco-friendly campus environment.
Project Objective
Establish a 225 KLD Sewage Treatment Plant to recycle and reuse wastewater.
Conserve groundwater and reduce dependence on external water sources.
Promote sustainability by reusing treated water for agriculture, sanitation, and gardening.
Enhance campus hygiene and reduce environmental pollution.
Detailed Project Components
| Component |
Description |
| Wastewater Collection |
Capture approximately 225 KLD of wastewater generated from 4000+ students and staff. |
| Treatment Process |
Screening, grit removal, equalization, biological treatment, clarification, disinfection, and sludge handling. |
| Water Reuse |
Treated water reused for paddy irrigation, toilet flushing, and gardening. |
| Sludge Management |
Solid sludge converted into organic manure for agricultural use. |
Budget Estimate for One STP
| Line item |
Cost (₹) |
| Screening chamber |
₹ 2,00,000 – 3,00,000 |
| Grit chamber |
₹ 1,00,000 – 2,00,000 |
| Equalization tank |
₹ 3,00,000 – 6,00,000 |
| Clarifier |
₹ 3,00,000 – 6,00,000 |
| Biological treatment reactor |
₹ 15,00,000 – 35,00,000 |
| Final Settling Tank |
₹ 4,00,000 – 8,00,000 |
| Disinfection (Chlorination system) |
₹ 1,00,000 – 2,00,000 |
| Sludge handling |
₹ 2,00,000 – 4,00,000 |
| Mechanical dewatering |
₹ 8,00,000 – 15,00,000 |
| Pumps, blowers, piping, valves, diffusers |
₹ 3,00,000 – 6,00,000 |
| Civil works, site preparation, tank construction |
₹ 8,00,000 – 15,00,000 |
| Commissioning, testing, documentation, O&M (1st year) |
₹ 2,00,000 – 5,00,000 |
Expected Impact
- Prevents contamination of nearby water bodies.
- Enables water reuse and reduces groundwater depletion.
- Treated water supports irrigation of paddy fields.
- Improves hygiene standards within campus.
- Demonstrates sustainable living and green practices to students.
Sustainability
Long-term operational cost covered through institutional funds and recycled water savings.
Transparency & Compliance
- Periodic updates and progress photos shared with donors.
- Audited financial statements ensuring proper fund utilization.
- Donations eligible for Section 80G tax exemption.
Implementation Plan
- Planning
- Civil Work
- Equipment Procurement
- Installation
- Training
- Testing
- Commissioning
Donation Options
| Type |
Description |
| Contribute to Infrastructure |
Fund specific STP components like tanks or treatment units. |
| Support Civil Works |
Sponsor construction and site preparation. |
| Adopt a Phase |
Sponsor a complete project phase (e.g., Installation or Commissioning). |
| General Donation |
Contribute any amount towards the total project cost. |